RCT
Consecutive energization and de-energization
Capability of setting the energization and de-energization fimes separately and individually
Usable as fluid rates control (DUTY CYCLE)
Usable as flasher ® Working start with energization tine
Signals:
ON: To display energization time
OFF: Te display de-energization time
Principles of Operation:
OFF timer starts timing. OFF signal gets on as soon as supply is connected to terminals Al and A? (internal contact of terminal 15 to 14 is made).
At the end of time adjusted by T.OFF handle. OFF signal gets off. ON signal gets on and connected relay (intemal contact of terminal 15 to 18 is made).
At the end of time adjusted by T.ON handle. OFF signal gets on. ON signal gets off and disconnected intemal relay (internal contact of tenminal 15 to 16 is made).
As long as supply 6 connected and has not dropped more than 40%. energization ond de-energization cycle repeats.
Technical Specifications:
Power Supply: 220 V AC.+10%
Network Frequency: 50 Hz. +5Hz
Intemal Loss: 3 w
Delay: 0.15-3 ec.30-400 Sec. 1.5-30 Min,3-60Min
Output Relay: Single-C/O contact
Contact Current: 6 A. 220 VAC- 6A. 28 VDC